Description of the accident:
A worker was erecting a formwork for drainage on a approximately
2.5 m deep excavation when it suddenly collapsed trapping him in between the
formwork and
ply-board used as a temporary wall to support the excavation.
Before it happens, a prop was used to support the ply-board but
somebody removed it in order to give way to the formwork that was to be
erected. Prior to this incident, it was observed that a JCB excavator was seen
delivering materials near the excavated area. Hence, this is the possible cause
of the incident that it might have disturbed the integrity of the excavation.
Fortunately, the injured person sustained minor injuries,
because he was trap only up to the knee level.
Cause of the accident:
The protection of the excavation is UNSAFE or inadequate
shoring.
PREVENTIVE MEASURES:
Keeping workers safe when they are working in excavation is to -
first, determine the soil type by consulting the geotechnical report and
second, once the soil type has been identified, then you can use one of the
types of excavation protective system illustrated below:
A. Shoring/Shielding

B. Benching
Method

C. Sloping
Method